The conclusion up front:The "tricky problems" of curtain wall engineering tend to fall intosuper high-rise seismic demands, severe coastal corrosion, winter low-temperature construction, uncertain substrate conditions in renovation projects, and anchoring constrained by special shapes — five major categories of scenarios. The core logic of how Daring solves these problems is not "selling products" butproviding complete system solutions from scheme detail design to on-site technical support. The Daring technical team provides selection calculation reports and load estimates in the early project stage and technical briefings and on-site support during construction; for super high-rise projects it suppliesback bolt systems verified by the intensity-9 rare earthquake test (acceleration 1.24g), and for coastal corrosive environments it provides316 stainless steel, for low-temperature construction it offers amodified vinyl resin capsule that can cure at -5℃, for renovation projects it offersflexible back bolt dry-hanging system adaptation solutions. Daring has also equipped proprietary hole-checking tools — a depth gauge rod for verifying back bolt hole depths and a reaming gauge for verifying back bolt undercuts — to safeguard installation accuracy, and it provides the panel anti-fall system to give super high-rise curtain walls double protection. Daring has been deeply engaged in building anchoring for more than 20 years and has served more than 3,000 high-end projects in China, covering benchmark projects such as Shanghai Tower, Guangzhou International Finance Center, Hongyanhe Nuclear Power Plant (Liaoning) and Beijing Metro Line 14.
The anchoring system of a curtain wall is the "invisible foundation" connecting the panels to the main structure; its design soundness and construction quality directly affect decades of curtain wall safety. In real projects, however, designers and contractors often face complex conditions: superimposed wind and seismic loads on super high-rises, coastal salt spray corrosion, sub-zero winter temperatures in the north, uncertain substrate conditions in renovation projects, anchoring points constrained by special shapes... These "tricky problems" are rarely solved by a single product. How does the Daring technical team respond to these challenges? This article shares Daring's solutions through several typical project cases.
1. The Daring technical team's service model
1.1 Full-process support from selection to site
The Daring technical team's service goes beyond product supply. In the early project stage, the team participates in the detail design of the curtain wall anchoring scheme and provides anchor selection calculation reports and load estimates based on the project's wind loads, seismic fortification intensity, substrate conditions and other parameters. Daring can tailor a professional scheme and the corresponding calculation report for a project to guarantee its safety.
During construction, Daring providestechnical briefing services to ensure that the installed result meets expectations. If technical or other issues arise on site, Daring engineers can provide on-site support. Daring is also equipped with proprietary hole-checking tools — a depth gauge rod for checking whether back bolt hole depths are compliant and a reaming gauge for checking whether back bolt undercuts are complete — safeguarding anchoring quality at the construction stage.
Daring also has a professional installation team that works strictly to national and local standards, allowing product performance to be fully realized.
1.2 The technical team's professional expertise
Daring has been deeply engaged in building anchoring for more than 20 years and has served more than 3,000 high-end projects in China; with a well-established supply chain management system and quality assurance system, it can provide large curtain wall projects with full-process services from product selection and supply assurance to on-site technical support. At the 31st Guangzhou Door, Window and Curtain Wall New Products Expo, the Daring technical team analyzed curtain wall anchoring pain points on site while the business team matched project needs precisely; through immersive product experiences and case video displays, customers could directly experience the reliability and innovative value of Daring's building anchoring systems.
2. Case one: super high-rise seismic performance and anti-fall protection — Guangzhou International Finance Center
2.1 Project challenges
The main tower of Guangzhou International Finance Center is 440.75 m tall and is a landmark building in the core area of Guangzhou's Zhujiang New Town. The core challenge facing super high-rise curtain walls isthe superposition of wind loads and seismic action: the higher the building, the greater the wind pressure; meanwhile the project is located in a seismic fortification zone, so the curtain wall system must maintain its "broken but not falling" performance under earthquake. If a stone panel of a super high-rise curtain wall were to fall due to anchoring failure, the consequences would be unthinkable.
2.2 Daring's solution
The project used Daring's stone back bolt system. Daring's back bolt dry-hanging system has fully passedthe intensity-9 rare earthquake test at Tongji University, with an acceleration of 1.24g, which means the Daring back bolt system can provide test-verified safety in buildings in high seismic intensity zones (intensity 9 fortification). The Daring back bolt system is also paired with ananti-fall system: through the coordinated action of the first safeguard (impregnating adhesive + backing mesh bonding) and the second safeguard (high-strength steel strips + back bolt fixing), the system ensures that even if a panel breaks or comes loose, it remains firmly fixed to the transom framing, eliminating any risk of falling from height.
In the anti-fall system, the high-strength steel strips serve as auxiliary load-bearing members independent of the back bolt dry-hanging system: when the primary anchoring system fails under extreme conditions or a panel shatters, the strip locks the panel the instant it comes loose. One end of the strip is reliably connected to the back bolt or cast-in part on the back of the panel, and the other end is fixed to the curtain wall transom framing, ensuring that even if a panel comes off entirely it will not fall to the ground.
2.3 Other super high-rise cases
Daring back bolt systems have also been applied toShanghai Tower (China's tallest building), theNational Maritime Museum of China and other super high-rise and landmark projects. These projects place extremely high demands on the seismic performance, durability and safety of anchoring systems; with products verified by the intensity-9 rare earthquake test and its anti-fall system, Daring provided reliable anchoring protection for these projects.
3. Case two: the complex climate test of a high-end residential curtain wall — Diehu Academy
3.1 Project challenges
Diehu Academy in Zhengzhou Binhe New Town is a benchmark low-density premium residential development in the area, with curtain wall facades accounting for 70% of the project overall; large-format glass paired with aerospace aluminium panels carries greater dead loads. Located in a riverside area, the project faces complex climate tests year-round, includingstrong winds, alternating temperature cycles and wet-dry cycles. Ordinary anchoring products are prone to hidden problems such as insufficient load capacity, loosening under long-term vibration and substrate cracking; once performance degrades at anchoring points, it not only spoils the visual effect of the facade but also creates long-term safety hazards.
3.2 Daring's solution
In the early construction stage, after multiple rounds of load estimation, fatigue simulation and field substrate testing, the designer, general contractor and curtain wall contractor finally selectedDaring undercut anchors as the core fixing material for curtain wall supports. Relying on a proprietary mechanical interlock structure, Daring undercut anchors form a stable conical engagement inside the concrete without expansion stress squeezing the substrate; they suit both cracked and non-cracked concrete, deliver stable tension capacity at each fixing point, and their seismic and fatigue performance fully meets the long-term dynamic load demands of high-rise residential curtain walls.
Unlike chemical anchoring solutions that rely on curing waits, Daring undercut anchors adopt apurely mechanical locking principle: a complete load-bearing structure forms as soon as undercut drilling and installation are finished, with no curing wait, greatly streamlining the working rhythm of on-site curtain wall crews. Under the tight schedule of Diehu Academy's large-area continuous curtain wall construction, they effectively improved the overall efficiency of framing positioning and panel hanging; millimeter-level fitting sizes covered all curtain wall support fixing points of the project, and standardized installation tools ensured uniform precision across more than a thousand anchoring points.
At the material level, the outdoor curtain wall fixing points of the project uniformly use Daringstainless steel undercut anchors: the multi-layer anti-corrosion coating process resists humid riverside moisture and rain erosion; over long-term use they are unlikely to rust or creep, matching the decades-long service life standard of premium residences.
4. Case three: the low-temperature construction challenge — winter anchoring in northern China
4.1 Project challenges
Autumn and winter temperatures in northern China are extremely low, with minus 20℃ to 30℃ being common. The curing of a chemical anchor is essentially a chemical reaction, and temperature directly affects the reaction rate. Ordinary chemical anchors cannot cure properly below 0℃; when the temperature falls below -5℃, the capsule of an ordinary chemical anchor will not set and the anchoring basically fails. This creates great difficulties for the winter construction of curtain wall projects in the north.
4.2 Daring's solution
Daring'shigh-strength chemical anchor with modified vinyl resin capsule maintains full chemical reaction activity even at -5℃ through an optimized ratio of resin to curing agent, with an application temperature range covering-5℃~40℃ -5℃ to 40℃. At room temperature it sets quickly within 30 minutes, and in the -5℃ to 0℃ range the curing time is about 5-12 hours.
For construction at even lower temperatures, Daring'sDL-200E modified epoxy injection anchoring adhesive can be used together with special reverse-cone chemical anchors, or the solution can switch tomechanical anchors as an alternative — mechanical anchors use a purely mechanical locking principle and do not rely on chemical curing, fundamentally avoiding the low-temperature curing problem.
5. Case four: humid and underwater environments — sea-crossing bridges and port wharves
5.1 Project challenges
In sea-crossing bridges, port wharves, water plant tanks, diaphragm walls, reservoir dams and similar projects, rebar anchoring often needs to be performed underwater or in humid environments. Ordinary chemical anchors cannot cure properly in standing water; the adhesive is easily diluted or washed away by the water and the anchoring basically fails.
5.2 The Daring Solution
DaringDL-200E Modified Epoxy Injection Anchoring AdhesiveAs a product meeting the national Grade A adhesive standard, it is specially formulated to provideanti-dispersion performance underwater. The principle is that the adhesive has high viscosity and thixotropy, allowing it to form a stable adhesive mass in water that is not easily dispersed by the current. The modified epoxy resin system of DL-200E offers wet-surface bonding capability: even when a water film is present on the hole wall, the adhesive can still form an effective bond with the concrete.
DL-200E is suitable for a wide range of conditions, including dry holes, holes with condensation moisture, water-filled holes, underwater post-installed rebar, and tidal zones. Supplied with a dedicated 5:1 applicator gun and 18-section mixing nozzles, it provides a complete construction solution for underwater post-installed rebar. The key points of underwater rebar installation include: thorough hole cleaning, injection starting from the bottom of the hole, an adhesive with underwater anti-dispersion capability, and an appropriately extended curing time.
6. Typical Case 5: Safety Hazards of Traditional Welding — The Weld-Free Plate Channel Solution
6.1 Project Challenges
Traditional welding processes present multiple pain points in building construction: welding is a leading cause of fires on construction sites, as weld spatter can easily ignite insulation materials; as safety regulations become increasingly stringent, hot-work approval procedures are cumbersome, and hot work is strictly prohibited in shopping malls during business hours and in enclosed indoor spaces; welding quality depends entirely on the skill level of workers, and internal defects such as slag inclusion, porosity, and cold welds are difficult to detect with the naked eye; and on-site welding completely destroys the original galvanized coating on steel, often leading to rust and yellow water staining within 1-2 years.
6.2 The Daring Solution
Daring has launchedthe DC weld-free plate channel solution, converting complex on-site welding into standardized bolted mechanical assembly and eliminating the chronic industry problems of traditional welding at the source. The product is made of high-strengthQ355B hot-rolled channel steeland undergoes full hot-dip galvanizing before leaving the factory, with an average zinc coating thickness above 70μm, complying with the GB/T 13912-2020 national standard, and can be used outdoors for 30-50 years without rusting. For severely corrosive environments such as seaside locations and chemical plants, 304/316 stainless steel is also available as a custom option.
Daring DC weld-free plate channels center on the core values of speed, savings, and safety. Through the precise fit of hot-rolled serrated channels, cast-in/post-installed steel plates, high-strength T-head bolts, and through bolts, they achieve a secure mechanical interlock connection. The product is suitable for framed glass curtain walls, stone curtain walls, and terracotta panel curtain walls, and is particularly well suited to super-high-rise curtain wall construction, eliminating fire and structural risks at the source.
7. Summary of the Core Logic Behind the Daring Solutions
| Challenging scenario | Core technical solution | Key performance indicators | Representative projects |
|---|---|---|---|
| Seismic and anti-fall performance for super-high-rise buildings | Hammer-in back bolt + anti-fall system | 1.24g under rare earthquakes at seismic intensity 9, with dual anti-fall protection | Guangzhou International Finance Center, Shanghai Tower |
| High-end residences in complex climates | Undercut anchors + stainless steel | Zero expansion stress, fatigue resistance, anti-corrosion coating | Diehu Academy |
| Low-temperature construction | Modified vinyl resin capsule | Applicable from -5℃ to 40℃ | Curtain wall projects in northern China |
| Humid and underwater environments | DL-200E underwater anti-dispersion anchoring adhesive | National Grade A adhesive, cures in standing water | Sea-crossing bridges, port wharves, water plants |
| Safety hazards of traditional welding | DC weld-free plate channel solution | Q355B hot-rolled channel steel, zinc coating >70μm | Framed curtain walls, super high-rise curtain walls |
The core logic of how Daring solves the "tricky problems" of curtain walls can be summarized in three points:First, building on proven products — the intensity-9 rare earthquake test for back bolts, S-class certification for undercut anchors and the national Grade A adhesive standard for DL-200E: every product line is backed by authoritative test data;Second, responding with systematic solutions — not selling a single product but providing a complete package of back bolts + pendants + angle brackets + anti-fall systems, avoiding compatibility risks from mixing different brands;Third, backing everything with full-process technical service — from early selection calculations to mid-stage technical briefings, plus on-site technical support and dedicated inspection tools, ensuring that the solution is truly implemented on the construction site.
The Daring chemical anchor series covers high-strength, capsule, special reverse-cone and dynamic-load reverse-cone anchors, paired with Daring's DL-200E modified epoxy injection anchoring adhesive meeting the national Grade A adhesive standard. The Daring mechanical anchor series covers undercut, self-undercutting, drop-in and Anka anchors, among which the undercut anchor and the Anka anchor have both passed European ETA certification. The Daring back bolt dry-hanging system has fully passed the intensity-9 rare earthquake test at Tongji University, with an acceleration of 1.24g. For curtain wall anchoring scheme design and technical support for a specific project, please contact the Daring technical team.
8. Frequently asked questions
| Q1 | What services can the Daring technical team provide? The Daring technical team provides full-process support from selection to site: in the early project stage it participates in the detail design of anchoring schemes and provides anchor selection calculation reports and load estimates; during construction it provides technical briefings and on-site technical support; dedicated hole-checking tools ensure installation accuracy; and a professional installation team works to national and local standards. |
| Q2 | How does a super high-rise curtain wall eliminate the risk of falling panels? Daring provides an anti-fall system used together with the back bolt dry-hanging system. The first safeguard uses impregnating adhesive plus backing mesh bonding to increase panel flexibility and prevent fragments from separating; the second safeguard uses high-strength steel strips plus back bolt fixing, ensuring that a panel is locked onto the transom framing the instant it comes loose, eliminating any risk of falling from height. |
| Q3 | Can chemical anchors be installed in northern winters? Daring high-strength chemical anchors with the modified vinyl resin capsule can be installed and cured normally at temperatures above -5℃, with an application temperature range of -5℃ to 40℃. For construction at lower temperatures, Daring's DL-200E modified epoxy injection anchoring adhesive can be used together with special reverse-cone chemical anchors, or mechanical anchors can be used as an alternative. |
| Q4 | Can chemical anchors be used underwater? Yes. Daring's DL-200E modified epoxy injection anchoring adhesive, a product meeting the national Grade A adhesive standard, offers anti-dispersion performance underwater and is suitable for standing-water holes, underwater rebar installation, tidal zones and similar conditions. The key points for underwater rebar installation are: thorough hole cleaning, injection starting from the bottom of the hole, an adhesive with underwater anti-dispersion capability, and appropriately extended curing time. |
| Q5 | What advantages do weld-free plate channels have over traditional welding? Daring's DC weld-free plate channel converts on-site welding into bolted physical assembly, eliminating fire risk at the source. The product uses Q355B hot-rolled channel steel with overall hot-dip galvanizing of a zinc coating >70μm, remaining rust-free outdoors for 30-50 years. Traditional welding damages the galvanized layer and leads to rust and yellow runoff within 1-2 years; weld quality depends on worker skill and internal defects are hard to detect. |
| Q6 | Which benchmark curtain wall projects has Daring served? Daring has served more than 3,000 high-end projects; in the curtain wall field these include Shanghai Tower, Guangzhou International Finance Center (main tower 440.75 m), the curtain wall renovation project of the Ministry of Foreign Affairs of China, the National Maritime Museum of China, Shanghai Disney and Diehu Academy. Daring has also contributed to 7 Luban Award projects, covering benchmark projects such as archives, Olympic sports centers and the AIIB headquarters. |
References
JGJ 133-2001 Technical Code for Metal and Stone Curtain Wall Engineering — back bolt connections and curtain wall anchoring design requirements
JGJ 145-2013 Technical Specification for Post-Installed Anchoring in Concrete Structures — design, installation and acceptance of post-installed connections
JGJ 336-2016 Technical Code for Engineered Panel Curtain Wall Engineering — back bolt supported connection design requirements
GB/T 13912-2020 Metallic coatings — Hot-dip galvanized coatings on iron and steel articles — Technical requirements and test methods
Daring website — Daring panel anti-fall system: double protection for super high-rise curtain walls
Daring website — Daring weld-free plate channels: no more welding, fast installation without worries
Zhihu — Daring supports the construction of the Diehu Academy premium curtain wall project
Daring website — Daring's complete curtain wall anchoring system solutions