The short answer:When drilling for a chemical anchor encounters rebar,never drill through it by force. The correct approach is to stop drilling immediately and proceed according to the following order of priority:First, shift the hole position within a small range (offset kept within 20-50 mm), and the shifted position must still meet the minimum edge distance and spacing requirements; if a single hole cannot be avoided, the anchor plate bolt hole may be reamed or reworked on site; if the rebar is too dense to avoid, a written report must be submitted to the supervisor and the design unit, and a formal design change must be processed. According to JGJ 145-2013, the minimum edge distance and minimum spacing of chemical anchors are both 6 times the threaded rod diameter; for M12, for example, both are 72 mm. The shifted hole position must still meet this requirement, and the embedment depth must not be reduced. Abandoned old holes must be tightly sealed with Class A repair adhesive or non-shrink epoxy mortar; leaving empty holes is strictly prohibited. Daring chemical anchors, combined with DL-200E modified epoxy injection anchoring adhesive, provide a reliable anchoring solution for hole position adjustments after rebar avoidance.

In post-installed anchoring construction, encountering rebar when drilling for chemical anchors is a situation on construction sites that isextremely common.problem. In reinforced concrete members such as tunnel secondary linings, bridge piers, and frame beam-column elements, the internal rebar is dense, and hitting rebar during drilling is nearly impossible to avoid entirely. To keep up with schedules, many construction workers choose to drill through with increased impact force; the hole gets through, but the rebar cross-section is weakened and microcracks form in the concrete around the hole wall, greatly reducing the anchoring capacity. This article systematically explains the correct handling of rebar encountered when drilling for chemical anchors, from the perspectives of detection methods, avoidance principles, reinforcement measures, and red-line prohibitions.

I. Rebar detection before drilling - Prevention is better than remediation

1.1 A rebar detector must be used

Before drilling begins, arebar detectorshould be used to scan the area around the anchor hole positions, determine the location, orientation, and cover thickness of the rebar, and proactively avoid the rebar when laying out the holes. Before drilling, the rebar positions within the lining should be located and marked, and when a hole conflicts with a rebar position, the hole position should be adjusted appropriately. After marking the anchor drilling positions on the concrete surface according to the design, use the rebar detector to scan around the marked points, avoid the internal rebar, and determine the final drillable positions. If there is rebar at the original position, the hole position must be adjusted and re-detected.

Consult the tunnel as-built drawings or structural construction drawings to understand the rebar arrangement and cover thickness. Set adepth limiteron the drill, which both ensures that the required embedment depth is reached and prevents drilling through critical structures such as the waterproof membrane.

1.2 Code requirements for the spacing between drill holes and rebar

According to Article 7.1.2 of JGJ 145-2013, the minimum spacing and minimum edge distance of chemical anchors are both6 times the anchor outside diameter (6d). Taking an M12 chemical anchor as an example, the minimum spacing and minimum edge distance are both72mm; for M16,96mm; for M20,120mm. The shifted hole positions must still meet this requirement, and the minimum edge distance of the anchors should not be less than twice the maximum aggregate particle size.

When the rebar spacing s in the anchoring zone is ≥150 mm, or when the rebar diameter d is ≤10 mm and s is ≥100 mm, the concrete may be considered uncracked. Before construction, the rebar arrangement of the base material should be evaluated against this condition.

II. Signals indicating rebar is encountered during drilling

If any of the following signals appears during drilling,stop the drill and withdraw the bit immediately, and continued forceful drilling is strictly prohibited:

  • A sudden increase in drill resistance, violent vibration of the drill body

  • A sharp metallic grinding sound from the drill bit, a marked drop in rotation speed

  • The bit stops advancing before the design depth is reached

The most common problem on site is the assumption that grinding a bit longer will get through. On the surface the hole appears to be complete, but internal damage has already been left deep inside the concrete. Continuing to drill after hitting rebar causes double harm: the drill bit cuts or even scores the load-bearing main bars, reducing the rebar cross-section and directly lowering the member's load capacity; at the same time, the impact and vibration of the drill create microcracks in the concrete around the hole wall, some of which are invisible to the naked eye. When adhesive is injected later, it seeps along these cracks, and under tension the anchor can easily pull out the entire concrete cone.

III. Avoidance plans after encountering rebar

3.1 Plan 1: Small-range hole offset (preferred)

Use the rebar detector to scan around the hole position, determine the rebar alignment, and move the position within the allowable range. The offset is generally kept within20-50mm, and after moving the hole it must be ensured thatthe minimum edge distance and minimum spacing are still met and the embedment depth is not reduced. Small offsets can be confirmed by the supervisor on site, while large offsets must be reported to the design unit for review.

It should be noted that the offset distance should be determined safely according to the strength of the concrete in the construction environment; the distance should be moderate and need not be excessive. When the concrete strength is high, the offset may be increased appropriately; when the concrete strength is low, the offset should be controlled to avoid damaging the base material.

Key inspection points after offsetting:

  • Re-detect whether rebar is still present around the shifted hole position

  • Confirm that the shifted hole position meets the minimum edge distance and spacing requirements (6d)

  • The embedment depth must not be reduced because of the offset

  • If the offset exceeds 50 mm, it must be reported to the design unit for review

3.2 Plan 2: On-site reaming or reworking of anchor plate bolt holes

If there are multiple bolt holes in the anchor plate and a single hole cannot be avoided, the bolt holes in the embedded plate can bereamed or reworked on site, with multiple points adjusted slightly at the same time to avoid the rebar. Major modifications must likewise be reviewed by the supervisor and the designer and must not be carried out without authorization.

3.3 Plan 3: Processing a formal design change (last resort)

When the rebar is so dense that there is no room to shift the hole,on-site handling at the contractor's own discretion is strictly prohibited. A written report must be submitted to the supervisor and the design unit to initiate a formal design change. Possible approaches include adjusting the overall anchoring position, recalculating the loads and changing the anchor specification, or replacing the anchoring system altogether.

To avoid damaging the rebar in the original member during drilling and to ensure the quality of the anchor holes, members containing rebar should be scanned; when rebar is found at an anchor hole position, the design unit should be notified to attend and handle the situation.

IV. Treatment of abandoned holes - A critical step that cannot be ignored

4.1 Abandoned holes must be sealed

The old holes abandoned after offsetting must becleaned thoroughly, and sealed tightly withClass A repair adhesive or non-shrink epoxy mortar. In the humid tunnel environment, untreated empty holes will sooner or later become water seepage channels. For projects with waterproofing requirements, failure to seal abandoned holes may also lead to leakage and affect structural durability.

4.2 Requirements for sealing materials

  • Class A repair adhesive: Suitable for sealing abandoned holes in load-bearing structures; high strength and strong bond

  • Non-shrink epoxy mortar: Suitable for sealing general abandoned holes; non-shrinking and provides good compaction

  • High-strength grouting material: Suitable for filling larger voids

V. Red-line prohibitions - Absolute limits that must not be crossed

Red-line prohibitionConsequence
Privately cutting or grinding longitudinal or circumferential load-bearing main bars is strictly prohibitedWeakens the load-bearing capacity of the structure and creates serious safety hazards
Handling of stirrups requires written permission from the designerWorkers have no authority to dispose of stirrups on their own
Privately drilling angled holes to avoid rebar is strictly prohibitedAnchors have extremely high requirements for hole perpendicularity, and the load capacity of an angled hole is cut in half
Reducing the drilling depth upon encountering rebar is strictly prohibitedIf the embedment depth is insufficient, the pull-out resistance cannot meet the requirements
Injecting adhesive and installing directly without treating a damaged hole wall is strictly prohibitedMicrocracks cause a significant reduction in anchoring force
Leaving abandoned drill holes unsealed is strictly prohibitedCreates water seepage channels and affects structural durability

VI. Daring avoidance solutions and product support

6.1 Product advantages of Daring chemical anchors

The Daring chemical anchor series covers high-strength, capsule-type, special reverse-cone, and dynamic-load reverse-cone anchors, combined with Daring's DL-200E modified epoxy injection anchoring adhesive, which meets the national Class A adhesive standard and offers strong bond anchoring, temperature resistance, and seismic resistance. Daring high-strength chemical anchors are supplied with chemical capsules that cure rapidly in 30 minutes at room temperature, with a pull-out force of up to 60 kN for M12.

Daring chemical anchors'the minimum spacing and edge distance are both 6 times the threaded rod diameter, which for M12 is 72mm; the shifted hole position still meets this requirement. The Daring capsule chemical anchor features a reverse-cone structural design with a dual load-bearing mechanism of chemical bonding plus mechanical interlock, and has passed the S-level anchor certification, 2 million cycle fatigue testing, 120-minute fire resistance testing, seismic testing, and other tests, and is suitable for both cracked and non-cracked concrete.

6.2 Daring recommendations for avoidance construction

  • Detection before drilling: use a rebar detector to scan the area around the hole position and mark the rebar locations

  • Small offset option: keep the offset within 20-50mm so that the shifted position still meets the 6d minimum edge distance and spacing requirements

  • Reaming and hole relocation option: for multi-hole anchor plates, holes can be reamed and relocated on site with synchronized fine adjustments at multiple points

  • Sealing of abandoned holes: Seal tightly with Class A repair adhesive or non-shrink epoxy mortar

  • Design confirmation: If the offset exceeds 50 mm or the rebar is too dense to avoid, the matter must be reported to the design unit for review

VII. Frequently asked questions

Q1What should be done when drilling for a chemical anchor encounters rebar?
Never drill through by force. Stop drilling immediately and first shift the hole position within a small range (offset kept within 20-50 mm); the shifted position must meet the minimum edge distance and spacing requirements. If a single hole cannot be avoided, the anchor plate bolt holes may be reamed or reworked on site. If the rebar is too dense to avoid, a formal design change must be initiated with the supervisor and the design unit.
Q2What are the minimum edge distance and spacing requirements after a hole is offset?
According to JGJ 145-2013, the minimum edge distance and minimum spacing of chemical anchors are both 6 times the threaded rod diameter (6d). For M12 this is 72 mm, for M16 96 mm, and for M20 120 mm. The shifted hole position must still meet this requirement, and the embedment depth must not be reduced.
Q3How should abandoned old holes be treated?
Abandoned old holes must be cleaned thoroughly and sealed tightly with Class A repair adhesive or non-shrink epoxy mortar. In the humid tunnel environment, untreated empty holes will sooner or later become water seepage channels.
Q4Can you drill through rebar by force?
Forceful drilling is strictly prohibited. It cuts or scores the load-bearing main bars, reducing the rebar cross-section, while the impact and vibration of the drill create microcracks in the concrete around the hole wall. When adhesive is injected later, it seeps along these cracks, and under tension the anchor can easily pull out the entire concrete cone.
Q5Are Daring chemical anchors suitable for hole positions adjusted to avoid rebar?
Yes. The Daring chemical anchor series covers high-strength, capsule-type, special reverse-cone, and dynamic-load reverse-cone anchors, combined with DL-200E modified epoxy injection anchoring adhesive. The minimum spacing and edge distance of Daring chemical anchors are both 6 times the threaded rod diameter, so shifted hole positions still meet this requirement.

The Daring chemical anchor series covers high-strength, capsule-type, special reverse-cone, and dynamic-load reverse-cone anchors, combined with Daring's DL-200E modified epoxy injection anchoring adhesive, which meets the national Class A adhesive standard. Carbon steel of grade 5.8 or above or 304/316 stainless steel is available. The minimum spacing and edge distance of Daring chemical anchors are both 6 times the threaded rod diameter; a drill bit matching the anchor should be used, and the rebar must be avoided during drilling to prevent damage to the main bars and the bit. For recommendations on rebar avoidance plans when drilling for chemical anchors in specific projects, please consult the Daring technical team.

References

JGJ 145-2013 Technical Specification for Post-Installed Anchoring of Concrete Structures - Anchor spacing, edge distance, and installation requirements

Daring website - Installation spacing of chemical anchors

Daring website - Installation method and specification table for reverse-cone chemical anchors

Daring website - Chemical anchor product series

Daring website - DL-200E injection anchoring adhesive product page

Back to Daring Home  Back to Top