The conclusion first:After curtain wall back bolts are installed,hole position and dimension inspection, pull-out capacity testing, and appearance and installation quality inspectionthree categories of on-site inspection. Among them, the pull-out capacity test isthe most critical inspection item. According to JGJ 145-2013 Technical Specification for Post-Installed Anchoring of Concrete Structures and JGJ 336-2016 Technical Code for Engineering of Artificial Panel Curtain Walls, the pull-out capacity of back bolts must meet design requirements, and the on-site non-destructive test load should reach1.2 times the design value, with a load-holding stability time of no less than2 minutes, and the anchor is judged acceptable only if there is no slippage, no loosening and no cracking of the base material. The sampling quantity is based on the total number of anchors in the inspection lot,at 1‰ and no fewer than 5 piecesand the inspection is carried out accordingly. Daring back bolt systems have passedTongji University's 9-degree rare earthquake seismic test, and are supplied with dedicated inspection tools such as hole-measuring rods and hole-measuring gauges to help construction personnel precisely control drilling quality.

In back-bolt curtain wall projects, on-site inspection after back bolt installation isthe final line of defense for ensuring curtain wall safety. As the core connectors between curtain wall panels and the main structure, the installation quality of back bolts directly affects the safety of the entire building. Many construction workers and supervisors lack a systematic understanding of what inspections are required after back bolt installation and what the inspection standards are. This article provides a comprehensive analysis from the perspectives of regulatory basis, inspection items, sampling rules and acceptance criteria.

I. Regulatory basis

1.1 Core standards

On-site inspection after curtain wall back bolt installation is mainly based on the following standards:

  • JGJ 145-2013Technical Specification for Post-Installed Anchoring of Concrete Structures - specifies the methods, sampling rules and acceptance criteria for on-site inspection of anchor pull-out capacity

  • JGJ 336-2016Technical Code for Engineering of Artificial Panel Curtain Walls - specifies the specific requirements for back bolt hole machining, installation and project acceptance

  • GB 50210Code for Acceptance of Construction Quality of Building Decoration - the main control item requirements for curtain wall project acceptance

  • DB34/T 3950-2021Specification for Acceptance of Construction Quality of Building Curtain Walls - back bolts should be tested on site for pull-out capacity and meet design requirements

1.2 Mandatory requirements of the standards for back bolt inspection

According to Clause 10.2.6 of JGJ 336-2016,the position, quantity and dimensions of back bolts used to connect curtain wall panels, as well as their pull-out capacity, should meet design requirements. The inspection method is: check the incoming acceptance records, construction records and the pull-out capacity test reports of the connection points.

Clause 10.2.7 further stipulates thatthe tensile and shear load capacities of the connection between the back bolt and the panel should meet design requirements, and the test reports on the tensile and shear load capacities of the back bolt-to-panel connection should be verified.

Before acceptance of the curtain wall project, on-site acceptance of concealed work should also be completed during the installation process,on-site acceptance of concealed work, including cast-in parts or post-installed anchor connectors.

II. On-site inspection items

2.1 Hole position and dimension inspection (inspection during construction)

The machining accuracy of back bolt holes directly determines the anchoring effect, so hole inspection must be carried out before installing the back bolts. A back bolt hole mainly consists ofthe straight-hole fit dimension, the undercut fit dimension (height), the depth fit dimension and the undercut fit dimension (diameter)four parts. The inspection methods are as follows:

  • Hole-measuring rod: used to check whether the straight-hole diameter and hole depth are acceptable

  • Hole-measuring gauge: used to check whether the undercut diameter is correctly formed

Using the two tools together can effectively determine whether a back bolt hole is acceptable. Generally,one hole measurement is required for every 30-50 holes, and if any nonconformity is found, all holes drilled with the same bit during that period must be checked one by one. Back bolt holes must not be damaged or chipped, and the hole interior should be smooth and clean.

Taking an M6 hammer-in back bolt as an example, the standard straight-hole diameter is11±0.3mm, and the standard undercut diameter is13.5±0.3mm. A hole diameter that is 0.5mm too large exceeds the allowable tolerance by nearly 1.7 times, preventing the back bolt sleeve from forming an effective key with the hole wall and causing a sharp drop in load capacity.

2.2 Pull-out capacity test (the most critical inspection item)

The pull-out capacity test is thecore itemof back bolt on-site inspection, used to verify whether the connection strength between the back bolt and the panel meets design requirements. On-site pull-out testing of back bolt holes mainly verifies the connection safety of external wall decoration materials such as dry-hung stone, ceramic panels and artificial panels.

The core inspection indicator of the pull-out test isthe ultimate pull-out capacity. Applying a standard load with instrumentation and observing whether the panel develops conical failure, crack propagation or back bolt slippage is the most direct method of evaluating the safety of curtain wall connections.

According to JGJ 145-2013, on-site inspection of anchor pull-out capacity can be divided intonon-destructive testinganddestructive testingtwo types:

  • Non-destructive testing: used for routine completion acceptance and record filing; the test load must reach1.2 times the design value, with a load-holding stability time of no less than2 minutes, and after loading to the specified load, the anchor is judged acceptable if there is no slippage, no loosening, no abnormal noise and no cracking of the base material

  • Destructive testing: used for new materials, new processes, first-time deliveries or batches of doubtful quality; loading is continued until the component fails, and acceptance requires the measured ultimate capacity to meet design requirements

2.3 Appearance and installation quality inspection

According to Clause 10.2.4 of JGJ 336-2016, the connections between the curtain wall framework and the cast-in or post-installed parts of the main structure, as well as between curtain wall components, should befirm and reliable, and the anti-corrosion treatment of metal frames and connectors should meet design requirements. The inspection method is:manual wrench check; check the acceptance records of concealed work.

Appearance and installation quality inspection mainly includes:

  • Position and quantity check: the position and quantity of back bolts should meet design requirements

  • Specification and dimension check: the specifications and dimensions of back bolts should meet design requirements

  • Connection firmness check: check by hand whether the connections between the back bolt and the pendant and between the pendant and the sub-frame are firm

  • Anti-corrosion treatment check: the anti-corrosion treatment of metal frames and connectors should meet design requirements

III. Sampling rules and acceptance criteria

3.1 Sampling rules

According to JGJ 145-2013 and related standards, sampling for back bolt pull-out tests should meet the following requirements:

  • Inspection lot division: anchors of the same type, specification, strength grade and anchoring base material constitute one inspection lot

  • Sampling quantity (non-destructive): take from the total number of anchors in each inspection lot1‰, andno fewer than 5 pieces

  • Sampling quantity (destructive): sampling ratio5% and no fewer than 5 anchors

  • Sampling locations: curtain wall corners, cantilevered parts, large-format panels, locations with large story-height spans and core load-bearing points on the windward face arehigh-stress areas, and these key locations have the highest priority for sampling. It is strictly prohibited to avoid such points or select favorable locations for testing

3.2 Acceptance criteria

Acceptance of back bolt pull-out tests requires comprehensive consideration ofnumerical values, failure modes and the loading processthree factors:

  • Load capacity requirement: the measured tensile load capacity should beno less than 1.2 times the design load(non-destructive test)

  • Load-holding stability: after loading to the specified load, hold the load for2 minutes, during which the load reading must not drop by more than 5%, and the anchor must show no slippage, no loosening and no abnormal noise

  • Base material integrity: no cracks or other signs of local damage in the base concrete

  • Failure mode: the ideal failure mode isconical failure of the base material; if the anchor is pulled out or the adhesive fractures, it is judged unacceptable

Slippage or displacement during loading indicates that the mechanical lock is not tight, which will inevitably lead to loosening and failure under repeated wind-induced loads. Insufficient installation torque or inadequate undercutting can cause anchor loosening, nut rotation or abnormal noise; such phenomena are typical construction quality defects.

IV. Test reports and acceptance documents

After back bolt installation inspection is completed, complete acceptance documents should be prepared, including:

  • pull-out capacity test reports for the connection points- demonstrating that the back bolt pull-out capacity meets design requirements

  • test reports on the tensile and shear load capacities of the back bolt-to-panel connection

  • acceptance records of concealed work- including cast-in parts or post-installed anchor connectors

  • incoming acceptance records- product conformity certificates, material reports and so on for the back bolts

  • Construction records- records of the back bolt installation process

Curtain walls are high-risk external enclosure structures, and post-installed anchors cannot be easily re-inspected or repaired; once the panels are closed up, rectification and re-inspection are almost impossible. Therefore, the completeness and authenticity of inspection documents are critical.

V. Frequently asked questions

Q1What on-site inspections are required after curtain wall back bolts are installed?
There are three main categories: hole position and dimension inspection (hole-measuring rod + hole-measuring gauge), pull-out capacity testing (non-destructive, 1.2 times the design value, held for 2 minutes), and appearance and installation quality inspection (manual wrench check, verification of position, quantity and specifications).
Q2What is the sampling ratio for back bolt pull-out tests?
For non-destructive testing, take 1‰ of the total number of anchors in the inspection lot, with no fewer than 5 pieces; for destructive testing, the sampling ratio is 5% with no fewer than 5 anchors. Key load-bearing locations such as curtain wall corners and cantilevers should be sampled first.
Q3What are the acceptance criteria for back bolt pull-out tests?
For non-destructive testing, load to 1.2 times the design value and hold for 2 minutes; if there is no slippage, no loosening, no abnormal noise and no cracking of the base material, the test is accepted. For destructive testing, loading continues until the component fails, and the test is accepted if the measured ultimate capacity meets design requirements.
Q4How is a back bolt hole checked for acceptability?
Use the hole-measuring rod to check the straight-hole diameter and hole depth, and the hole-measuring gauge to check the undercut diameter. Generally, one measurement is taken every 30-50 holes. Taking an M6 hammer-in back bolt as an example, the straight-hole standard is 11±0.3mm and the undercut standard is 13.5±0.3mm.
Q5Which standards govern back bolt inspection?
Mainly JGJ 145-2013 Technical Specification for Post-Installed Anchoring of Concrete Structures and JGJ 336-2016 Technical Code for Engineering of Artificial Panel Curtain Walls, with reference to GB 50210 Code for Acceptance of Construction Quality of Building Decoration.

Daring's back bolt range covers hammer-in, screw-in, cast-in and high-load back bolts, made of 304/316 stainless steel, achieving stress-free dry-hung anchoring of external wall panels through mechanical locking. Daring's back bolt dry-hung systems have passedTongji University's 9-degree rare earthquake seismic test, and are supplied withhole-measuring rods and hole-measuring gaugesand other dedicated inspection tools to help construction personnel precisely control drilling quality. For advice on back bolt inspection plans for specific projects, please consult the Daring technical team.

References

Daring website - How to drill dimensionally acceptable back bolt holes

Daring website - What inspections should be carried out before back bolts are installed on the wall

JGJ 145-2013 Technical Specification for Post-Installed Anchoring of Concrete Structures

JGJ 336-2016 Technical Code for Engineering of Artificial Panel Curtain Walls

GB 50210 Code for Acceptance of Construction Quality of Building Decoration