| [Scope of Application and Compliance Statement]The back bolt selection and layout technical recommendations in this articleapply only to non-structural building envelope components such as building curtain walls and exterior facade hanging panelsdry-hung connection systems. Post-installed anchoring design for load-bearing structures and main structures must strictly follow GB 50367 Design Code for Strengthening Concrete Structures (Clause 16.1.5 clearly stipulates that mechanical anchors used in load-bearing structures are permitted only in buildings with a seismic fortification intensity not exceeding 8 and built on site classes I and II, and are strictly prohibited in fortification zones of intensity 9 and above), and its top-level mandatory basis must comply with GB 55002-2021 General Code for Seismic Design of Buildings and Municipal Engineering. Do not confuse the code applicability boundaries between non-structural components and load-bearing structures. |
Conclusion first:When the building seismic fortification intensity reaches 8 (0.20g, 0.30g) or 9 (0.40g), the back bolt dry-hung systems of curtain wall non-structural components must adopthigh-reliability seismic reinforcement configurations. The key points cover four dimensions: first, regarding configuration, ordinary rigid single-cut back bolts without cushioning are not recommended in high-intensity zones; preference should be given todouble-cut back bolts with flexible damping sleeves (such as high-toughness engineering nylon sleeves) or seismic undercut back bolts, to prevent high-frequency reciprocal vibration from tearing the stone at the hole bottom; second, the material is recommended to beS31608 (A4 group) highly corrosion-resistant austenitic stainless steel, with a nominal diameter of not less than 6mm (M8 recommended for large or heavy panels), to avoid stress corrosion fracture induced by the superposition of alternating dynamic-load stress and harsh environments; third, the spatial layout should be controlled based on load calculations, withpanel area controlled within 0.8m², four or more evenly distributed support points, back bolt spacing normally controlled within 800mm (and ≥5 times the panel thickness, determined through calculation), edge distance ≥50mm and not less than 2 times the panel thickness, anchoring depth ≥1/2 of the panel thickness, and the remaining thickness at the hole bottom guaranteed; fourth, mature products should be selected that have seismic shake-table simulation test reports issued by authoritative third-party institutions (such as the 2023 intensity-9 rare-earthquake dynamic load test report issued by the State Key Laboratory of Disaster Reduction in Civil Engineering of Tongji University, with a peak acceleration of 1.24g), together with 6063-T6 thick-wall aluminium alloy pendants and self-locking anti-loosening fittings, to achieve the "break but not fall" protection objective under rare earthquakes.
In fortification zones of intensity 8 (0.20g, 0.30g) and 9 (0.40g), peak ground acceleration rises significantly, and the out-of-plane inertial seismic forces on curtain wall panels often reach more than 1.5 to 2 times those in intensity 6-7 zones. Simply copying the conventional product selection and large-span layout schemes of low-intensity zones can easily cause punch-out spalling of the stone at the hole mouth, pendant derailment, or panel detachment under strong inter-story drift and high-frequency oscillation during severe earthquakes. Combining current national seismic codes, industry standards, and engineering practice, this article provides a systematic analysis of the selection, calculation basis, and layout essentials of curtain wall back bolt systems in high-intensity zones.
1. Seismic Challenges Facing Non-Structural Components in Zones of Fortification Intensity Above 8
1.1 Dynamic amplification of horizontal and normal inertial seismic forces
The standard value of the horizontal seismic action borne by curtain wall panelsFmust be determined strictly according to the seismic calculation formulas for non-structural components in Clause 13.2.3 of GB/T 50011-2010 Standard for Seismic Design of Buildings:
F = γ · η · ζ1 · ζ2 · αmax · G
Using the equivalent lateral force method and considering the out-of-plane load characteristics, it is converted into the standard value of seismic load per unit area perpendicular to the curtain wall panel directionqEk (unit: N/m²):
qEk = F / A = γ · η · ζ1 · ζ2 · αmax · Gk / A
where:Fis the standard value of horizontal seismic action on the non-structural component (N);Ais the panel area (m²);γis the function coefficient of the non-structural component;ηis the category coefficient;ζ1 is the component state amplification factor;ζ2 is the position coefficient: 1.0 at the bottom, 2.0 at the building top, with linear distribution along the height (for structures with a large height-to-width ratio, pronounced torsional effects, or those requiring supplementary time-history analysis, the value should be adjusted per the calculation results, in which case the high-level amplification effect may exceed 2.0);αmax is the maximum horizontal seismic influence coefficient under frequent earthquakes (0.16 for intensity 8 at 0.20g, 0.24 for intensity 8 at 0.30g, 0.32 for intensity 9 at 0.40g; the rare-earthquake scenario is used separately to verify system elastoplastic displacement and anti-fall safety);Gk / Ais the standard value of panel self-weight per unit area (N/m²).
[Note]:Clause 5.2.5 of JGJ 133-2001 adopts an equivalent formqEk = βE · αmax · G / A(βE is the dynamic amplification factor, taken as 5.0), and its physical essence isγ · η · ζ1 · ζ2 (the product of factors: 1.4×0.9×2.0×2.0 ≈ 5.04 ≈ 5.0). When the result obtained by taking values item by item according to GB/T 50011 is smaller than that calculated withβE=5.0, the more conservative value is usually adopted in engineering practice; the system adopted in the design calculations shall prevail. Note also that the provisions of JGJ 133 list values only up to intensity 8 (αmax=0.16); for intensity 9 zones, values should be taken directly from GB/T 50011.
On this basis, the standard-value tension from wind load borne by a single back boltNwk and the standard-value tension from seismic actionNEk (unit: N) are calculated with the following formulas:
NEk = 1.25 · qEk · A / nandNwk = 1.25 · wk · A / n
(Note: 1.25 in the formula is the load non-uniformity coefficient, taken based on product type test reports, relevant industry codes, and the load distribution characteristics of the project-specific hanging system; values may differ for different hanging configurations;nis the number of back bolts effectively carrying tension on a single panel). Under high-level, high-intensity conditions, the calculated instantaneous pulse pull-out force and shear force increase severalfold, placing stringent requirements on the load uniformity and constructional ductility of anchoring nodes.
1.2 Inter-story drift of the main structure and displacement ductility of nodes
Under severe earthquakes, the main structure undergoes intense reciprocal elastoplastic deformation. As an exterior envelope non-structural system, the in-plane deformation performance class of the curtain wall must match the inter-story drift ratio of the main structure. According to the classification standard of GB/T 21086 Building Curtain Walls (with classification testing per GB/T 18250), the in-plane deformation performance of curtain walls in high-intensity zones should reach class 1/100 or above. Compared with linear continuous restraint systems such as through-slots, back bolt point-support configurations offer better multi-directional micro-movement accommodation; however, the pendants must have sufficient slotted-hole sliding allowance and anti-unhooking engagement depth to prevent brittle shear fracture of back bolts caused by lateral structural movement.
1.3 The "break but not fall" protection objective under rare earthquakes
The core performance objective for non-structural components under rare earthquakes is "break but not fall": even if brittle stone develops local cracks under the combined action of strong seismic shear waves and out-of-plane bending moments, the deep undercut mechanical self-locking configuration of the back bolts and the aluminium alloy hanging system behind must still maintain complete support, preventing large pieces of cladding material from falling as a whole from height.
2. Technical Requirements for Back Bolt Selection in Zones of Fortification Intensity Above 8
2.1 Configuration: damping elastic bushings and double-cut mechanical interlock
The key to back bolt selection in high-intensity zones isblocking rigid stress concentrationandenlarging the shear surface at the stone hole bottom:
Elastic damping isolation:Direct hard contact between the metal bolt body and the drilled stone hole wall is strictly prohibited. Back bolts must be fitted with high-toughness engineering nylon sleeves (such as PA66) or modified vibration-damping sleeve pads. Under reciprocal alternating dynamic loads, the elastic sleeve provides slight elastoplastic buffering, absorbs high-frequency impact energy, and blocks the transmission of local stress spikes to the brittle stone matrix.
Double-cut undercut reverse-cone configuration:Double-cut back bolts form a mechanical self-lock by grinding an annular internal reverse-cone groove at the stone hole bottom, combined with steel bearing washers and an expansion ring. Under alternating positive wind pressure and reverse suction, the effective bearing area of the stone at punch-out failure is multiplied, the effective cross-section thickness approaches the full panel thickness, and the shear punch-out load capacity at the hole bottom is greatly enhanced.
2.2 Material grade: prefer S31608 austenitic stainless steel
Regions with strong seismic activity are often accompanied by geostress activity or humid, salt-spray environments. Under long-term prestress and dynamic seismic tensile impact, inferior metals are prone to stress corrosion cracking (SCC). Codes require back bolt material of no less than 06Cr19Ni10 (S30408); in curtain wall projects in zones above intensity 8 and for important public buildings,06Cr17Ni12Mo2 (S31608/A4 group) stainless steel is strongly recommended. S316 contains molybdenum and offers excellent pitting resistance and corrosion fatigue resistance. The nominal thread diameter should not be less than 6mm; for thick, heavy panels or cantilevered decorative panels, M8 is preferable.
2.3 Back bolt types and application scenario matching
| Back bolt type | Working principle | Recommended panel thickness | Suitability and features in high-intensity zones |
|---|---|---|---|
| Hammer-in back bolt | Central core driving drives the six-segment expansion segments to expand and lock circumferentially along the bottom groove | ≥25mm natural granite and dense artificial stone | ★ Highly recommended. High load capacity; the Daring six-segment sleeve distributes load evenly, backed by intensity-9 rare-earthquake dynamic load testing |
| Screw-in back bolt | Precise thread rotation press-fit with impact-free slight expansion mechanical locking | 8~15mm thin ceramic slabs and terracotta panels | ★ Recommended (thin panels). Impact-free installation effectively prevents micro-cracking of thin brittle panels |
| Heavy-load back bolt | Deepened anchoring section, extra-thick double-flange bearing plate, and impact-resistant damping elastic kit | ≥30mm large stone moldings and large cantilevered members | ★ Recommended for special heavy loads. Superior pull-out and bending moment resistance, specifically for heavy loads and irregular members |
2.4 Load capacity calculation and code-based safety factor values
When verifying back bolt load capacity in high-intensity zones, the sources of key technical parameter values must be made clear:
Partial safety factors for material and anchoring load capacityγR:The national code JGJ 133-2001 does not define this value uniformly. Referring to Table 4.3.10 of JGJ 145-2013 Technical Specification for Post-Installed Anchoring in Concrete Structures, the partial safety factor for the anchoring load capacity of non-structural componentsγR is taken according to the failure type (values for brittle failure modes such as concrete cone tension and anchor pull-out are significantly higher than for steel failure; 2.15 is commonly adopted in practice as the safety margin for anchoring in brittle base materials). The punch-out failure mode of curtain wall back bolts in brittle panels is similar, so values are commonly adopted by analogy. The specific value shall be based on the original table of the code, the technical standards of the project location, and the design calculations.
Seismic adjustment factor for load capacityγRE and the reduction coefficientk:According to Clause 4.3.5 of JGJ 145-2013 Technical Specification for Post-Installed Anchoring in Concrete Structures, the seismic adjustment factor for the anchoring load capacity of post-installed connectionsγRE is taken as 1.0 (T/CECS 828-2021 Technical Specification for Seismic Anchoring of Non-Structural Components in Building Engineering contains the same provision); under seismic design situations, it shall additionally be multiplied by the reduction coefficient of anchoring load capacity under seismic actionk(taken by category per Clause 4.3.9 of the code or from the anchor product certification report). Meanwhile, the partial safety factor for anchoring load capacityγR is taken by failure type according to Table 4.3.10 of the code (as noted above, 2.15 is commonly adopted for brittle failure modes). TheγRE value is fully consistent with the Chapter 13 provision of GB/T 50011 that "connectors may adopt 1.0".Note: the partial safety factors and seismic adjustment factors described in this section belong to the resistance side and the action combination side respectively; they must be applied in the sequence specified by the design documents during verification, without repeated reduction or omission.
Combined biaxial load verification:Back bolt connection nodes in high-intensity zones must simultaneously verify normal tension/compression perpendicular to the panel and horizontal shear parallel to the panel, with rigorous review against the tension-shear interaction curve.
3. Layout Design Recommendations for Back Bolts in Zones of Fortification Intensity Above 8
3.1 Panel module area control
Component inertial force is proportional to component self-weight. In low-intensity zones, single stone panels are commonly controlled within 1.0~1.2m²; however, inhigh-intensity fortification zones of intensity 8 and above, it is recommended to optimize the area of individual stone panels to within 0.8m². Each panel must haveno fewer than 4 back bolt support points, forming a statically determinate or symmetrically constrained support grid; two-point non-redundant hanging of large exterior facade panels is strictly prohibited.
3.2 Back bolt spacing control principles
Engineering-recommended spacing values:In conventional projects, back bolt spacingis generally recommended to be controlled within 800mm. Codes do not set 800mm as an absolute mandatory upper limit; spacing must ultimately be determined through calculations of panel bending strength and deflection under wind load and seismic action. However, in high-intensity zones, spacing exceeding 800mm leads to excessive mid-panel span and a significant increase in out-of-plane dynamic seismic stress. For panels with larger spans, additional mid-span back bolt points should be added and verified through finite element structural analysis.
Minimum spacing requirements:The center-to-center distance of adjacent back bolt holesshould not be less than 5 times the panel thickness(for example, for 25mm stone, spacing should not be less than 125mm). This criterion is a company and engineering experience guideline developed in practice to prevent adjacent punch-out failure cones from overlapping and merging, and it also echoes the minimum anchor spacing control principles of JGJ 145 to prevent brittle cascading cracking among multiple bolts.
Conventional recommended range:In zones of intensity 8 and above, the back bolt center spacing of main load-bearing panel spans is recommended to be kept within500~800mman appropriate range to balance the panel bending stress and the load distribution among the anchors.
3.3 Back bolt edge distance control
Minimum edge distance baseline:The perpendicular distance from the back bolt center to the stone edgeshould not be less than 50mm, and preferably not less than 2 times the panel thickness(considering product technical certification and punch-out cone expansion angle requirements, e.g., for 30mm stone the edge distance should be ≥60mm), to prevent premature edge spalling on the hole side of the stone under shear and tension.
Maximum edge distance limits:The distance from the back bolt center to the panel edge should not exceed 0.25 times the supported edge length, and at most should not exceed 150~200mm, to avoid excessive vibration or even fracture of overly long cantilevered free ends under reciprocal seismic dynamic response.
Biaxial coordination requirements:The edge distances in both directionsbx andby must not both take the minimum value of 50mm; if one side takes 50mm, the edge distance on the other side should be greater than 100mm.
3.4 Red lines for anchoring depth and remaining thickness at the hole bottom
Effective anchoring depth:The reamed anchoring depth of the back bolths must never be cut arbitrarily; it should be strictly controlled withinhthe range of1/2 to 2/3of the panel nominal thickness (i.e., 0.5h ≤ hs ≤ 0.67h)。
Remaining thickness at the hole bottom:In high-intensity zones, double-cut back bolts with flexible damping sleeves should be preferred, and their remaining thickness at the hole bottomshould not be less than 6mm; where a single-cut reamed back bolt is genuinely required after special technical justification, its remaining thickness at the hole bottommust never be less than 10mm. Regardless of the form used, the undercut reaming quality at the specified angle at the hole bottom must be strictly guaranteed; forced press-in installation without reaming is strictly prohibited.
4. Technical Performance and Verification of the Daring Back Bolt System in High-Intensity Zones
4.1 Verification by full-scale seismic simulation testing from an authoritative third-party institution
The Daring hammer-in back bolt dry-hung system hasa three-dimensional multi-directional seismic shake-table test report issued by the State Key Laboratory of Disaster Reduction in Civil Engineering of Tongji University (report year: 2023). In the three-dimensional shake-table dynamic test simulating intensity-9 rare earthquake action with a peak input acceleration of1.24g(above the code spectral value magnitude corresponding to intensity-9 rare earthquakes, constituting an enhanced-condition verification), the tested specimens of Daring back bolt nodes remained structurally intact, with no pull-out, slippage, or shear fracture of connectors and no radial damage around the stone drilled holes, meeting the safety protection requirements for non-structural components under high-level ground motion.
4.2 Stress equalization advantage of the proprietary six-segment expansion
The Daring hammer-in back bolt adopts a uniquesix-segment circumferential expansion design. Compared with the four-segment split sleeves common in the industry, after core-driving lock-up the six-segment expansion sleeve achieves 360° symmetrical circumferential contact with the internal reverse-cone hole wall of the stone, effectively equalizing the circumferential contact stress distribution on the stone hole wall and greatly reducing stress concentration peaks. Under alternating horizontal and vertical combined load impacts in major earthquakes, it effectively prevents localized overloading and cracking of brittle panels, with a safety margin significantly higher than ordinary back bolts.
4.3 Complete system matching and anti-loosening construction
Daring supplies matching 4.0mm thick 6063-T6 aluminium alloy pendants, above the lower limit commonly used in conventional projects, offering higher section strength and seismic redundancy. The hook-to-rail engagement overlap depth is guaranteed at ≥10mm, and the connecting bolts are fitted with mechanical self-locking anti-loosening washers or anti-loosening coating, ensuring that fastened components do not vibrate loose under long-term vibration and sudden strong earthquake impacts.
5. Construction Quality Management and On-Site Testing Control in High-Intensity Zones
5.1 Drilling precision and undercut groove inspection
Construction in high-intensity zones must use dedicated portable or CNC undercut drilling machines. After drilling, inspection should usededicated go/no-go hole gauge rods and internal diameter/depth gaugesfor 100% inspection, strictly verifying the undercut cone angle and depth to eliminate false reaming or insufficient bottom diameter. Dust in the hole must be blown out thoroughly with oil-free compressed air.
5.2 Torque-controlled assembly and calibrated marking
Back bolt tightening must be applied with a calibrated torque wrench or dedicated pneumatic socket. Note in particular: hammer-in back bolts rely mainly on mechanical limit stopping of a dedicated punch to drive the core and expand into shape;torque control mainly applies to screw-in back bolt installation and final tightening of hanging bolts. Their final tightening torque reference values (typically 4~6N·m for M6 and 8~11N·m for M8) must be strictly followed per the technical briefing, and quality inspection marks must be made after tightening.
5.3 On-site sampling inspection and type test verification
Pull-out inspections during construction must clearly define the technical requirements and acceptance boundaries of two types of tests:
On-site in-situ non-destructive testing:On-site sampling is based mainly on non-destructive pull-out testing. The test load is applied up to the proof load required by design and held for 2 minutes; it is judged acceptable if the load drop does not exceed 5% and the anchor shows no slip displacement.
Type test failure mode verification:In full-scale destructive type tests at the early project stage, the failure mode at ultimate load capacity should be a deep punch-out failure cone in the panel matrix; bolt pull-out slippage or brittle tensile fracture of the bolt cross-section is strictly prohibited.
6. Frequently Asked Technical Questions (FAQ)
Q1 | Can the back bolts and post-installed anchoring design in this scheme be used for strengthening load-bearing structures such as concrete beams and columns in intensity-9 zones? Use is strictly prohibited.According to the mandatory provision of Clause 16.1.5 of GB 50367-2013, mechanical anchors used in load-bearing structures may only be used in buildings with fortification intensity ≤8 and built on site classes I and II; post-installed anchoring technology is strictly prohibited for load-bearing members in intensity-9 zones. The scheme in this article is limited to non-structural envelope systems such as curtain walls and hanging panels. |
Q2 | Which code does the partial safety factor of 2.15 for the tensile load capacity of back bolts come from? JGJ 133-2001 does not define this value uniformly. Referring to Table 4.3.10 of JGJ 145-2013 Technical Specification for Post-Installed Anchoring in Concrete Structures, the partial safety factor for the anchoring load capacity of non-structural components is taken according to the failure type (values for brittle failure modes such as concrete cone tension and anchor pull-out are significantly higher than for steel failure, and 2.15 is commonly adopted in practice as the safety margin for anchoring in brittle base materials); the punch-out failure mode of curtain wall back bolts in brittle panels is similar, so values are commonly adopted by analogy. Relevant local standards and group standards such as T/CECS 828-2021 also give similar values. The specific value shall be governed by the technical standards of the project location and the design calculations. |
Q3 | Is the 800mm back bolt spacing a mandatory code requirement? It is not an absolute ban; codes require that layout spacing be determined through strength and deflection calculations. Controlling spacing within 800mm in conventional practice is to avoid excessive bending stress in panels under strong out-of-plane seismic acceleration; if spacing exceeds 800mm, local structural verification must be performed and measures such as thicker panels or local reinforcement must be taken. |
Q4 | Why do high-intensity zones require the back bolt edge distance to be, in addition to ≥50mm, not less than 2 times the panel thickness? Under combined tension-shear loads, a back bolt forms a conical shear failure body within the stone around the hole. If the edge distance is less than 2 times the panel thickness, the shear cone easily extends to the stone side face and causes edge spalling; maintaining sufficient edge distance ensures a full shear section and the formation of a complete shear resistance cone. |
Q5 | Why is S316 stainless steel preferred for back bolts in high-intensity zones? Components in high-intensity zones endure long-term alternating micro-vibration and dynamic tensile stress, and stainless steel in highly stress-concentrated areas carries a risk of stress corrosion cracking (SCC) in humid salt-spray environments. S316 (A4) stainless steel, with added molybdenum, offers better intergranular corrosion resistance and stress corrosion cracking resistance, effectively ensuring safety over the 50-year design reference period. |
In high-intensity seismic fortification zones, the connection and anchoring of non-structural curtain wall components concerns life escape routes and the bottom line of public safety. Shanghai Daring Building Technology Co., Ltd. specializes in providing high-grade integrated curtain wall anchoring solutions for non-structural components; its hammer-in back bolts, screw-in back bolts, and matching aluminium alloy pendant systems have high-grade seismic simulation test reports issued by the State Key Laboratory of Disaster Reduction in Civil Engineering of Tongji University. For calculation verification and tooling technical support for non-structural components in intensity-8 and intensity-9 seismic zones of specific projects, please consult the Daring Engineering Technology Center.
References
GB 55002-2021 General Code for Seismic Design of Buildings and Municipal Engineering — mandatory top-level seismic fortification requirements
GB/T 50011-2010 Standard for Seismic Design of Buildings (formerly GB 50011-2010 (2016 edition)) — Chapter 13, seismic calculation of non-structural components
GB 50367-2013 Design Code for Strengthening Concrete Structures — Clause 16.1.5, mandatory provisions on applicable site classes and intensity for anchors in load-bearing structures
GB/T 21086-2007 Building Curtain Walls and GB/T 18250-2015 — in-plane deformation performance and seismic classification testing requirements for curtain walls
JGJ 133-2001 Technical Code for Metal and Stone Curtain Wall Engineering — provisions on undercut back bolt dry-hung connections for stone curtain walls
JGJ 145-2013 Technical Specification for Post-Installed Anchoring in Concrete Structures — technical requirements, partial safety factors, and seismic adjustment factors for anchoring connections of non-structural components
T/CECS 828-2021 Technical Specification for Seismic Anchoring of Non-Structural Components in Building Engineering — seismic anchoring adjustment factors and technical index requirements for non-structural components
State Key Laboratory of Disaster Reduction in Civil Engineering, Tongji University — dynamic load seismic test report for the Daring back bolt curtain wall dry-hung system under intensity-9 rare earthquakes (2023, peak acceleration 1.24g)